In-Situ Stabilization Delisting for Heavy Metals (8RCRA)
Mound Street VAP Site
Stabilize and delist lead contaminated soils to allow for a VAP closure of a former battery recovery manufacturing site.
> Read More
On-site Stabilization of Soils
Provided on site treatment of approximately 500 tons of lead and cadmium contaminated soils at a manufacturing site in Northern West Virginia.
> Read More
SAIC Sludge Pond Closure
Remove, stabilize and dispose of 3,000 cubic yards of sludge.
> Read More
> Back to Top
|
Ex-situ Excavation and Disposal
Burgess & Niple Ltd.
Solidify 1,200 cubic yards of sludge from plant WWT operations.
> Read More
Installation of a Wetlands for Secondary Treatment of Waste Water
Installation of .37 acre wetland for a secondary treatment of waste water.
> Read More
Encapsulate Lead Contaminated Soils
Remove, stabilize and replace 2860 cubic yards of impacted soil. Create a 24" Direct contact cover. Over 90,000 sq. ft. area.
> Read More
> Back to Top
|
Liquid-Boot®
Pantheon Building
Installed 20,000 square feet of Liquid Boot gas vapor barrier liner under floor slab for a new addition to an existing building.
> Read More
Portsmouth High School
Application of cold-spray applied gas vapor membrane and passive vent system.
> Read More
> Back to Top
|
Steel or HDPE Piling Cut-off Wall
Olentangy River Road/Evans Run Stormwater System Improvements
Installation of PVC sheet piling into stream bed to control water flow and reduce erosion in suburban area in two sections.
> Read More
Containment Cut-off Wall
Installation of 2,150 linear feet of steel sheet piling up to 50 feet in length, for a total quantity of 66,580 sq.ft.
> Read More
Duck Creek-Phase II, Local Flood Protection Project
Local flood protection along Duck Creek, consisting of approximately 680 lineal feet of composite sheetpile I-wall with concrete facing and cap.
> Read More
> Back to Top
|
Biopolymer Slurry Wall
Environ, RCRA Clean Up
Free product recovery of DNAPL chemical in ground water at 35' depth. Installation of a 750'+ containment soil bentonite wall 38' deep.
> Read More
Installation of Interceptor Trench
Installation of interceptor trench with biopolymer material; installation of bentonite slurry wall to a 40' depth excavation.
> Read More
> Back to Top
|
Bentonite/Clay Barrier Walls
Installation of Interceptor Trench
Installation of interceptor trench with biopolymer material; installation of bentonite slurry wall to a 40' depth excavation.
> Read More
RCRA Closure Site at a Manufacturing Facility
Installed a 300 feet passive reactive barrier wall (PRB) to intercept chlorinated solvents at a manufacturing facility in Northeast Ohio.
> Read More
Lagoon Stabilization
Solidification of three-acre sludge pond, 18,0000 cubic yards closure system with vertical clay barrier wall and 2' clay cap system.
> Read More
> Back to Top
|
Geo-Composite Liner (GCL)/HDPE Liner/Cap Construction, Installation, and Landfill Cover Material
SAIC Hazardous Waste Landfill Cleanup
Closure of an industrial waste landfill four-acre area.
> Read More
Rickenbacker Passenger Terminal
Site grading for 33,800 square foot building pad and foundations in potentially contaminated soil. Installed gas vapor collection system with 4" HDPE piping and passive venting.
> Read More
Ross Aluminum Foundry - Avon Warehouse
Installation of a ground water and soil remediation system.
> Read More